At A Glance:
- Location: London
- Client: DP World
- Consultant: RMC Building & Civil Eng Ltd
- Contractor: Jewson
Products Supplied:
- Models supplied:
3no. TS400 25,000L
1no. TS400 25,000 HVY
- Models supplied:
2no. 4125 C1/ESR
- Models supplied:
3no. P600 1C/ESR
1no. P600 1C/ESR HVY



Titan Logistics Park, Plot 2050B forms part of a major expansion of DP World’s existing logistics hub. This development supports a wider strategic vision to significantly increase operational capacity, contributing to the creation of the UK’s largest container port facility.
Large-scale logistics sites such as this require high-performance drainage infrastructure capable of handling heavy vehicle movements, large impermeable areas, and strict environmental compliance standards.
The Challenge
The expansion of the logistics park introduced increased surface water runoff and pollutant risk associated with high-traffic HGV movements and container handling operations.
As with similar large infrastructure schemes, the drainage design needed to:
- Manage high volumes of surface water efficiently
- Provide effective pollutant interception
- Meet strict environmental and regulatory requirements
- Withstand heavy-duty loading conditions across the site
Our Solution
We supplied a tailored package of SuDS-compliant drainage products designed to deliver both performance and durability across the development.
A combination of Full Flow and Bypass ESR treatment systems was utilised to ensure appropriate levels of treatment depending on flow rates and risk areas across the site. These systems work to remove hydrocarbons and suspended solids, helping to protect surrounding watercourses.
In addition, SPEL Tankstor attenuation systems were installed to manage peak flow rates and control discharge, reducing the risk of flooding and ensuring compliance with drainage regulations.
All products were selected for their robust construction and suitability for heavy-duty applications, ensuring long-term reliability within a demanding logistics environment.
DP World is a global leader in logistics and supply chain solutions. This project builds on our established relationship with the client, having supplied solutions across multiple plots and developments.
Our experience working with DP World and various drainage contractors enabled a smooth delivery process, ensuring consistency in product performance and specification across the wider site.
The successful delivery of drainage solutions for Plot 2050B supports the ongoing expansion of one of the UK’s most significant logistics hubs.
By providing a reliable, high-performance SuDS solution, the project benefits from:
- Effective surface water management
- Long-term environmental protection
- Infrastructure capable of supporting heavy operational demands
This project further demonstrates our ability to deliver scalable drainage solutions for large, complex logistics developments.



