At A Glance:
- Location : Dunston, Gateshead
- Client: Dunston Business Village
Products Supplied:
- Comprising: SPEL 400 Series 40,600 litre Septic/Settlement tank plus 2no. SPEL Tankstor 45,500 litre tanks fitted with various sewage treatment plant treatment stages.
- SPEL provided the required air blowers, circulation pumps and associated control panels and air manifolds as a complete Packaged Sewage Treatment plant system supplied and commissioned by SPEL
Located just off Junction 13 of the M6 and very near the M6 Toll, this business part offers over 60,000 square foot of mixed sizing office accommodation for a variety of business sizes. The office layouts and rooms can be tailored to meet the requirements of the business with office spaces available from 800 square feet to over 10,000 square feet.
A bespoke sewage treatment plant system was required to ensure as cost effective a solution as possible. A site specific solution ensures that the system is correctly sized, no oversizing and associated extra costs. SPEL have a sewage treatment plant specialist who looks at information provided from the customer and designs a system to suit their requirements.
This system comprised of 3 separate tanks all fitted out with different settlement, biological treatment and aeration sections to meet strict Environmental Agency standards. The first stage of treatment was a SPEL 40,600 litre Septic/Settlement tank that removed the bulk of large solids. The foul waste then passed through 2 further tanks, both using a SPEL Tankstor 45,500 litre tank and fitted with a range of differing sewage treatment processes to meet the required standards, whilst also catering for the maximum anticipated flow from the business park.