Case Study | South Bank Link Road, Teesport | SPEL Smartceptor
The Teesside Freeport, is the UK’s largest tariff free customs zone offering many advantages to businesses, including a package of tax relief to help drive jobs, investment and growth, streamlined planning processes and simplified customs procedures. The site consists of 4500 acres with over £200 million invested already invested and
Case Study | Snowdon (Yr Wyddfa) Café & Visitor Centre | Rainsave
First opened in 2009, this unique building, the highest visitor centre in the UK, is built in the most unforgiving of environments and has been made to withstand the mountain’s extreme weather conditions while blending in with its natural surroundings as much as possible. It houses a café and gift
Case Study | Silvertown | Stormceptor
This new 1.4km twin-bore road tunnel under the Thames will be the first in London in over 30 years, with estimated costs of around £1.2 billion for its construction. This modern tunnel will have a user charge and improved cross-river public transport will improve transport links for all. The tunnel
Case Study | RAF Brize Norton | SPEL Stormceptor
RAF Brize Norton is located about 30 minutes west of Oxford in the United Kingdom. RAF Brize Norton is the largest RAF Station worldwide with around 6,000 staff and Service Personnel over it’s 1,190 acres! It is home to the RAF’s Air Mobility Force (Air Transport) and Air-to-Air Refuelling forces,
Case Study | Orwell Logistics Park | ESR Range Bypass Treatment System
Orwell Logistics Park is a major industrial and distribution hub located near Ipswich, Suffolk, UK. Situated close to the Port of Felixstowe, the largest container port in the country, the park offers strategic access to key transportation routes, including major highways and rail links. It provides modern warehousing and logistics
Case Study | Local Village Stores Bicton | StormCheck
A new village stores was required in the small and relatively untouched Shropshire village of Bicton, near Shrewsbury. High quality water treatment was required and a SPEL Stormceptor 210C1/SC was used to treat the stormwater run-off from the car park. As the site was a greenfield site, the discharge was
Case Study | Luton Airport | StormPump
First opened in 1938, Luton Airport was then used by the Royal Air Force during WW2. Commercial activity and general aviation flights resumed during 1952 and by the 1960s, Luton Airport was playing a key role in the development of the package holiday business with a fifth of all holiday
Case Study | Hyde Park Botanical Gardens (& Botanic Garden of Wales) | Rainsave
Hyde Park is a Grade I-listed major park in Central London established in 1637. It is the largest of four Royal Parks that form a chain from the entrance of Kensington Palace through Kensington Gardens and Hyde Park, via Hyde Park Corner and Green Park past the main entrance to
Case Study | Digiplex Oslo, OSLO4 Campus | Rainsave
STACK’s OSL04 campus (Holtskogen Campus) is located in Holtskogen, east of the city of Oslo, with more than 18MW available at various stages of development. Stack Infrastructures, Holtskogen Campus including the already complete OSL04C unit and the two units currently under construction, OSLO4E and OSLO4A are highly efficient data centres
Case Study | Dawley & Malinslee | Attenuation
The Telford Langley School is a secondary school with academy status, located in the Dawley area of Telford in Shropshire, England. The school has around 1000 students, who benefit from state of the art educational facilities and sports facilities. The sport facilities are also open for community use. The construction
Case Study | Chiltern Lifestyle Centre Amersham | SPELFilter
SPEL provided six SPELFilter cartridges which will work alongside a SPEL ESR Stormceptor unit in protecting the valuable water source on site at Chiltern Lifestyle Centre. Chilterns Lifestyle Centre offers a wide range of facilities to serve the local community, these include two pools with kids’ teaching facilities and a
Case Study | Aberdeen Harbour | Stormceptor
The £420 million Aberdeen South Harbour expansion was completed in 2023 after 6 years of construction. First built in 1136, Aberdeen Harbour is the oldest port in the UK. With the North Harbour only able to accommodate cargo and cruise ships up to 165m in length, it was decided to
Case Study | A1 Contract, Leeming & Barton | SPEL Stormceptor
National Highways invested £400 million in a 12-mile stretch of the A1 between Leeming and Barton – upgrading from a dual-carriageway to a new 3 lane motorway. This section of road is used by between 59,000 and 69,000 vehicles everyday and a 20% reduction in journey times and safety improvements
Case Study | MOD DC North Longtown, Carlisle | ESR Range Full Flow Treatment System
MOD DC North Longtown, located near Carlisle in Cumbria, is a Ministry of Defence (MOD) Defence Munitions (DM) storage facility. It specializes in the storage, maintenance, and distribution of munitions and explosives for the UK’s armed forces. The site features secure storage bunkers and extensive land, and it plays a
Case Study | Glasshoughton | ESR Range Bypass Treatment System
The Prism Park Industrial Distribution Development, located in Wakefield, West Yorkshire, is a prime example of modern industrial real estate aimed at meeting the growing demands for logistics and distribution space in the UK. This strategic development, situated close to Junction 31 of the M62 motorway, capitalizes on Wakefield’s excellent
Case Study | Red Bull | ESR Range Bypass Treatment System
Red Bull Racing has officially opened its state-of-the-art Red Bull Powertrains facility, signaling a bold step into the future of Formula 1. Backed by Ford, this partnership marks the American automaker’s return to F1 for the first time in nearly two decades. The facility, located in Milton Keynes, is designed