This new 1.4km twin-bore road tunnel under the Thames will be the first in London in over 30 years, with estimated costs of around £1.2 billion for its construction. This modern tunnel will have a user charge and improved cross-river public transport will improve transport links for all. The tunnel will also include good walking and cycling areas and the areas near the tunnel entrances will be part of a major regeneration. When it opens in 2025 the Silvertown Tunnel will reduce delays at the Blackwall Tunnel, with journey times predicted to be up to 20 minutes faster whilst reducing the environmental impact of traffic congestion.